INJORA RC Transmitter 2.4GHz 6CH Controler and Receiver and 25KG Digital Servo for 1:10 RC Crawler SCX10 TRX4 D90

★★★★★ 4.1 89 reviews

$56.00
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by venunataraj.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
$56.00
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Jun 6
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by venunataraj.com
Free 30-day returns Details

Product details

Management number 216406934 Release Date 2026/04/19 List Price $22.40 Model Number 216406934
Category

Great Anti-jamming: Adopting 2.4Ghz technology, FHSS 67 channels frequency hopping spread spectrum.Quick Receiver Response: Signals will be responsed within 3ms when you control your model within 400m to 500m.Supporting Mix Control: Each of the 3 channels can be set respectively, supporting mixed control of 1 and 2 channels.High precision RC Servo -- Upgraded version digital servo for RC model.Large torque -- Maximum torque of this RC Servo can up to 26kg/cm. (6V)

  • Great Anti-jamming: Adopting 2.4Ghz technology, FHSS 67 channels frequency hopping spread spectrum.
  • Quick Receiver Response: Signals will be responsed within 3ms when you control your model within 400m to 500m.
  • Supporting Mix Control: Each of the 3 channels can be set respectively, supporting mixed control of 1 and 2 channels.
  • High precision RC Servo -- Upgraded version digital servo for RC model.
  • Large torque -- Maximum torque of this RC Servo can up to 26kg/cm. (6V)
Size Large
Theme RC Toys
Brand Name INJORA
Manufacturer INJORA
Power Source battery powered
Operation Mode Automatic
Indoor Outdoor Usage Outdoor
Is Assembly Required No
Age Range Description Kid
Educational Objective Game, play
Supported Battery Types required, battery powered

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.1 out of 5
★★★★★
89 ratings | 36 reviews
How item rating is calculated
View all reviews
5 stars
77% (69)
4 stars
7% (6)
3 stars
4% (4)
2 stars
2% (2)
1 star
10% (9)
Sort by

There are currently no written reviews for this product.